Project: Valley Hospital
Roof Type: Built Up Roofing Systems

 

Project Profile


Owner:

  • Valley Hospital

Building:

  • Underground Mechanical Room (UMR)

Size:

  • 6,500 s. f.

Problem:

  •      The owner needed to utilize the space occupied by the building more efficiently

Solution:

  •      Make the area accessible to the general public. This could be obtained by removing the existing roof over UMR and replace it with a 30 year Garland System and a green scape cap.

Advantages:

  • Environmentally friendly
  • Extended roof life
  • Aesthetics
  • Functionality
  • Reduced energy costs.